Hydrostatic Test Pump

/, Other Product/Hydrostatic Test Pump
Hydrostatic Test Pump2019-05-03T19:45:00+00:00

Project Description

  • Water should be engaged before the machine started.
  • Set the contact manometer to the test pressure.( the tube which is going to be test, must fill with water in outside. )
  • Start to motor,
  • Mechanical testing system is available under the machine. Set the pressure valve according to your test pressure,
  • After test, stop the motor first than close the water valve.